This project included the repairs and alterations of a six-story existing hotel to suit the new hotel design. The ground floor post-tension slab required numerous post tension cable repairs, in the range of 10 percent of the cables found required repair. TBA also provided review of the slab edge anchorage condition including repairs and waterproofing around the whole perimeter of the building to provide protection from the elements.

Repairs were also performed on cracked and failed concrete piers at the main roof steel supports on the upper level. These were repaired in place or replaced with new concrete while the main roof framing was temporarily supported.

Project Numbers

Varies

Square Footage

Condition Assessment, Concrete Repair, Concrete Strengthening, Structural Steel Design, Post Tension Cable Repairs and Construction Administration

Services

Project Gallery

Click on photo below to see full gallery of photos

480 King St – Repairs
480 King St – Repairs

A broken post-tension cable as found in the ground floor slab.

480 King St – Repairs
480 King St – Repairs

This is one of several vertical cracks measuring approximately 1” at the widest point, that was found in concrete piers supporting the roof structure.

480 King St – Repairs
480 King St – Repairs

Repair to an end anchorage for two post-tensioning cables.

480 King St – Repairs
480 King St – Repairs

A broken post-tension cable as found in the ground floor slab.